Central Walk Modification Submissions Report

https://www.sydneymetro.info/sites/default/files/document-library/Chatswood%20to%20Sydenham%20Central%20Walk%20modification%20submissions%20report.pdf


this document is the modification submissions report of the Central Walk project. This report provides classification to the information presented in the modification report and responses to the issues raised in submissions. The central station has been developed over many decades leading to its current layout and configuration hindering efficient customer movement and transfer. There are multiple level changes between each of the existing concourses, many of which no longer comply with current design standards. The only accessible route at the station that connects all platforms is via the North Concourse under the suburban platforms.
East concourse: this concourse provides an accessible connection to the suburban and metro platforms at a common floor level and meet the growing demands at the station now and in the future.
East entry: a new entry on Chalmers Street providing access to east concourse and central station
Overall, the project of central walk services only for the transport aspect.

评论

热门博文