Central Walk Modification Submissions Report
https://www.sydneymetro.info/sites/default/files/document-library/Chatswood%20to%20Sydenham%20Central%20Walk%20modification%20submissions%20report.pdf
this document is the modification submissions report of the Central
Walk project. This report provides classification to the information presented
in the modification report and responses to the issues raised in submissions. The
central station has been developed over many decades leading to its current layout
and configuration hindering efficient customer movement and transfer. There are
multiple level changes between each of the existing concourses, many of which
no longer comply with current design standards. The only accessible route at the
station that connects all platforms is via the North Concourse under the
suburban platforms.
East concourse: this concourse provides an accessible connection to the
suburban and metro platforms at a common floor level and meet the growing
demands at the station now and in the future.
East entry: a new entry on Chalmers Street providing access to east
concourse and central station
Overall, the project of central walk services only for the transport aspect.